Estimated installation Time: 15 mins
- Twist on the included antenna securely.
- Choose an ideal location, ensuring the power cord and irrigation wires can reach the controller. Mark the top with a pencil.
- Use a 3/16-inch bit to drill the included screw through the drywall 3/8β below the mark, leaving 1/4β out for hanging.
- Hang the controller on the screw, ensure itβs level, and mark the spot for the second anchor with a pencil.
- Drill a hole for the second anchor and use a Phillips screwdriver to tighten the screw.
- Connect Sprinkler Wires
- Connect Power
- Plug in the power; all 4 LEDs will turn on.
- Press and hold the reset button for 3 seconds or until the 3rd and 4th LEDs start flashing.
- Scan QR code to pair